Mumbai-Nanded Vande Bharat Delayed By 32 Minutes After OHE Fault Near Kasara

The Mumbai-Nanded Vande Bharat Express was delayed by around 32 minutes on Monday after an overhead equipment (OHE) insulator developed a fault in the Kasara-Igatpuri ghat section near Kasara.
According to officials, railway staff immediately attended to the defective OHE insulator after the issue was identified. Central Railway personnel carried out the necessary repairs on a priority basis to minimize disruption along the route.
A Central Railway spokesperson confirmed that the repair work was completed without any further operational issues, allowing the train to safely resume its journey.



